Quantcast
Channel: SCN : Discussion List - Enterprise Asset Management (SAP EAM)
Browsing all 5426 articles
Browse latest View live

when we use the PM02 and PM05 control keys in plant maintenance

Dear PM Guru' I would like to know the difference between the PM02 and PM05 control keys. In general continuously i am using the PM01(Internal Operation) & PM03 (External Service) control keys in...

View Article


is it possible to make the schedule based on month specific

Dear Pm Guru's One of the my client have the scheduling of all preventive maintenance plans are based on month specific. In general all the plans are based on Date specific, but now in EHP6 on wards...

View Article


Equipment classification-Characteristic values

Hello Experts, We have mainatained classification  for many  equipments with different  characteristics and characteristic values.Now the requirement is to fetch these characterstics (either single...

View Article

Quotation creation for non revenue bearing order type (SM03) in repair process.

Hi Team, We have business flow for repair process like this: Service notification--> Repair order (SD document type RAS) --> service order --> Quotation --> Service order Confirmation and...

View Article

Condition Based maintenance

Hi all,               Can anybody please explain how the system generates order for condition based maintenance ?

View Article


Damaged Material returning to stores

A Breakdown order is created to replace the damaged material say pump. so the new pump is drawn from the stores & fixed to the equipment & made it ready. Now I want to know will the damaged...

View Article

Service Notification numbers missing or does not exist

Dear All I did check all the link related to this topic but couldnt find the solution . Hope i could get some solution soon . Normal scenario in which the customer calls in and the call agent creates...

View Article

User status issue in notification

Hi ,I have a user status with status number 15. Lowest is 11 and highest is 15.  My notification is currently is in status 15.  If I try to change the status to "11 /12 etc it is not allowing.  Can...

View Article


Scheduling log does not contain any entries

Hello, SAP GURU.I have a problem with scheduling in PM orders.When I run function Schedule (Ctrl+F4) system show message C7119 "Scheduling log does not contain any entries".My PM order have the next...

View Article


PMIS Reports

Whether PMIS reports ( mci series) comes default in SAP or is it developed with the help of ABAP ? if its developed , How ?Please anybody help me out in this.

View Article

Image may be NSFW.
Clik here to view.

Control key for operation

Hi All, Can u please explain me with an example the fields in control key for PM which is in SPRO settings. Fields like Scheduling, Det.Cap.Req, Cost, Print, Print time ticket,Sched.ext.op.. I am not...

View Article

when we use the IE4N transaction code

Dear PM Guru's In Configuration control business function we will get the IE4N transaction code and some business functionality of Installing / Dismantling the equipment. Exactly in which business...

View Article

SAP PM - Refurbishment - Expense versus inventory during refurbishment activity

Dear experts, I am having an issue in the refurbishment process. What is happening is that finance does not approve that material moves to an expense account during refurbishment activity because it...

View Article


set-up Warning Message, "Planned costs" crosses "Estimated costs"

HI Experts, Using the "Costs field  - USER4" in maintenance order,  to maintain the estimated costs, while dealing with the projects. Business expectation is to give an alert with warning message , Any...

View Article

Image may be NSFW.
Clik here to view.

System calculation for 'Earliest finish time' in maintenance order operation

Hi,  Please help me to figure out how SAP calculates the 'Earliest fininsh time' in maintenance order opeartion. refer below screenshot: For operation 'test', I have entered 10 mins as work required,...

View Article


SAP and GEO.e

Hi, Can you tell me more about GEO.e ?What is the minimum architecture for this solution ?What are the necessary application components ? Is there documentation available ?Thanks.Olivier.

View Article

Installation of Equipment via IE4N

Hi All  Thanks for giving yor attenion to my request . Pl suggest.  Via T-code IE4N, i dismantle one equipment already installed at function location with movement type 262. It's working fine.  Now...

View Article


how we can assign the already created interval number to group in EHP6

Dear PM Guru's Currently we are using ECC6.0, EHP 6 with patch level 0002. In that when i am trying to assign the external interval number range to other groups. How i can assign that interval number...

View Article

Maintenace Notification subscreen responsibilities

Hi,FriendsIn the Maintenance Notification Header tab of Responsibilities Sub screen can i incorporate User id field rather Person response fieldcan we do in Standard Custmization ? Thanks,Kumar

View Article

Serialized equipments

Hi  Experts At the time of production the serial no is assigned & from the serial no equipment is made automatically in my scenario. (Serial no = Equipment No) My question is that how do I keep...

View Article
Browsing all 5426 articles
Browse latest View live


<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>