Quantcast
Channel: SCN : Discussion List - Enterprise Asset Management (SAP EAM)
Viewing all 5426 articles
Browse latest View live

In PM order, at the Time of operation confirmation, cost is not flowing into correct cost center.

$
0
0

Hi Experts,

 

While operation confirmation of PM order, the cost is not flowing into settlement receiver (cost center) i.e. it is taking wrong cost center,profit center and company code.

 

Ex. We had made a PM order say company code (which is maintain in equipment master) "A" and cost center ( cost center in equipment and work center) "111" and profit center "xyz" but while operation confirmation cost if flowing to company code "B" and cost center "222" and profit center "abc"

 

Please suggest.

 

Thanks

 

Vishu


WCM: WCA not Closed after WOCO, despite the setting in Application Profile

$
0
0

Greetings Experts, Gurus and SAP Sages!

We have the flag "Automatic Close of Applications" set in the WCM Application profile; therefore, the status Closed is set automatically. We are using Enhanced WCM model.

 

Even if the WCA was open in Change mode at the time of granting WOCO (e.g. by another user), it should still close automatically.However, in a (very) few instances in the production system whereby the relevant Work Order has been set to the status WOCO, but the WCA was not set to CLSD. Users have to do manual closure.

 

It also seems that this is very erratic and we were not able to reproduce this issue in a QA environment.

 

Have you seen this issue in WCM? Is that a program issue, or a performance issue? I have done some research, but turned up nothing conclusive, I wonder if this is a known problem with automatic WCA closure...

 

Different Number range for 3 different Plant for same object.

$
0
0

Dear Guru,

 

 

My client require to have different number range for 3 different plant for Notification, Work Order & WCM Object.

 

 

For example, For Notification type M1 (which is common for Plant 1,2 & 3) From Number range 1000000-9999999, they want to assign 1000000-3999999 to Plant 1, 4000000-6999999 to plant 2 & 7000000-99999999 to plant 3.

 

 

Upon checking various thread, I came to know one user exits "IWO10017 Determine external Work order number by customer logic" but didn't get any user exit for Notification and WCM Object(Work Approval, WC Application, WC Document).

 

 

Need your expert advise on how to create different number range for 3 different plant? .

Description of Tagging condition in WCD document.

$
0
0

Dear Experts,

 

While we are creating Work clearance Document & selecting Tagging condition, short text of Tagging condition display in drop-down as per screenshot no.1.

 

 

 

When we select tagging condition from drop-down, short text didn't appear(screen shot no.2). Is there any way that we can populate short text in the switching screen?

 

Please check attachment for screenshot.

SAP ERP solution map

$
0
0

hi experts

 

i need information how to use SAP ERP solution map

User Exit : Auto Release Sub orders

$
0
0

Hello Gurus,

 

I want to automatically Release the sub orders when superior order is Release.

 

After I wrote to SCN, I came to know that In Standard, There is no provision to auto release or auto TECO or auto Business completion of Sub Orders based on Superior Order business transaction.


Can some one please correct the exit & condition I selected


On exit IWO10009 when saving the superior order


IF sy-tcode = 'IW32'.

 

SELECT AUFNR

FROM AFKO

WHEREMAUFNR = caufvd_imp-AUFNR

 

release_order = 'X'.

 

ENDIF.

 

If above exit is incorrect,Can I use Exit IWO10002

If above exit is correct,Can I same to auto Business complete the Sub Orders when Superior Order CLSD


Thanks in Advance


Ashok  M

Actual Hours difference between IW38 and IW47

$
0
0

Hello all.

I have a unique situation that I am trying to handle. Am trying to see if someone here knows what is happening.

 

I have a Work Order. In the "Costs" tab and in the "Quantities" Sub tab

Planned hours of Word=36 hrs

Actual Hours=35 hours.

But when I run IW47 to see all the confirmations to this order, it only shows 3 confirmations totalling 14 Hours.

 

While in the order the actual hours is 36. I am not sure what happened to the remaining 21 Hours. Can someone please tell me what else could be going on here.

ERP_CO_OLC_E007 Operation and activity cannot be entered at the same time

$
0
0

Good afternoon everone,

the transaction MB1A is reporting the error above when trying to register an autput of goods moviments against an order of manteinance.

 

This type of order had cost control at the level operation activated.

 

Anyone know how to solve this problem?

 

Thanks,

Adilson Delfino

 

See Image the error

MB1A.PNG


Basic start date & Basic finish date based on Priority

$
0
0

Dear Experts,

 

When I am creating Notification & selecting Priority, System gives pop-up “do you want to specify new dates?” If I select yes system automatically change required start & required end based on Priority.

 

Now my question is do we have same functionality for Maintenance order as priority field is available there (If we are directly creating a MO)?

 

Even if we are creating WO from notification, required start & end dates copies to Basic start & Basic finish but if we change priority then no change in basic start & finish dates. Why?

Result analysis for service orders with operation account assignment

$
0
0

Hi,

 

We have activated function 'LOG_EAM_OLC' business function Operation Account Assignment. The service order is customer facing service order. The cost are posted to operation level. Result anaysis can only be run on order head level. However, I am not able to settle the result analysis becuase settlement rule is not allowed on order head level.

 

Have any of you met the same dilemma?

 

 

Regards,

Jimmy

User Exit required for WCM

$
0
0

Dear Experts,

 

Client wants to have list of employee names in F4 help/drop down of Approved. By field (Highlighted with yellow colour in screen no.2)

 

Is there any user exit available for this kind of requirement? If not, how can we map this with customization.

 

Please let me know if more clarification required. Thanks.

 

WCLE.JPG

Screen no.2

 

Approved by.JPG

Planned Value in sap pm order

$
0
0

Hello All,

 

Please explain me from where the planned value updates in refurbishment order in sap pm.

 

Thanks,

Regards,

piyush

IE4N – dropdown list validation

$
0
0

Hello Friends,

 

I'm putting this qustion to this forum on behalf of someone else who doesn't have an SDN account.

 

In IE4N transaction, there is a dropdown that has "Attach with movement", "Detach with movement" etc. Question is, where is this validated list coming from? Can you share the config path please?

 

Thanks

JD

Assign Default Status Profile to revision type

$
0
0

Hi Experts,

 

We have requirement to use user status in Revision (MEB).

I have created Status Profile for Object Type Revision, but i cant find the menu path in configuration to assign it to revision type (to make it as a default status profile)

Currently we have to enter the status profile manualy every time we create a revision.

Is there any way to assign the status profile to the revision type ?

Preventive Work Order Dates Synchronization with its automatic created notification

$
0
0

Hi all,

 

I am looking for the answer for the way to solve my pending issue.

 

we are running IP10 or IP30 regularly and system creates work orders and the work order also creates its notification automatically.

 

but the problem is that the dates on the notification and work order are not same, but end user want to make it so.

 

"Basic start" & "Basic fin." date on work order seems determined by its plan date(IP10) or some other date criteria.

 

so, the dates could be far from now, it could be 3 months later dates or 6 months later dates, so on. this is not a problem.

 

but Required Start & Required End date on notification seems determined by its execution date of IP10 or IP30.

 

so, the dates used not be far from now, it's near future date, this is a problem!, I am assuming that the base date for calculating Required Start & Required End date with notification's priority seems the execution date of IP10 or IP30.(am I right?)

 

is there any method to modify the dates on notification based on its following work order while IP10 or IP30 runs?  

(actually, in this case the notification would be the following documents of the work order because system will creates work order firstly and creates notification next step)

 

if you have any difficulty for reading my poor English, please ask me more detail or explanation.

 

thank you for your help in advance.


SAP PM interface with Plant DCS

$
0
0

Hello,

   We have an OPC server and we are contemplating at an interface of Plant DCS with SAP PM.

Is SAP ODA a right approach? Do we have a other way to handle such interface?

Thanks....

TOM V.S.

Field Selection issue in Equipment master data

$
0
0

Dear Experts ,

 

                             'Class' Field in general data tab & Functional loc field in change equipment installation location pop up in structure tab of equipment master data are in display mode. How to change this to Input mode ?

I tried a lot but not successful.

please help

 

Regards

Keerthan Kumar

How to deactivate order type?

$
0
0

Hi everyone,

i need to deactive(or remove) some order type. But when i tried to remove order type i cant access the any old order.

I am gettingthis warning:


Order type does not exist

Message no. IW205

123.PNG

 

 

So how can i deactive the some order type while reaching the old data. i dont want to see some order type on IW31 order type search help or anywhere. is that possible?

Process flow

$
0
0

    Dear Experts

 

Can anybody provide the process flow visio diagram for Plant Maintenance such as breakdown maintenance, preventive etc. Please send it to my mail ID ravitej.t@live.com

 

Regards

Ramesh

Reqirement Assignment Tab in Maintenence order

$
0
0

Dear Experts,

 

I'm struggling to bring the "Requirement Assignment Tab"in the maintenance order, altough all the pre-requsits in the work centre like Other formula SAP008/SAP004/SAP00 distribution formula  have been maintained including the HRMS is also maintained in work centre.

I have checked most of the links/threads on google but no success, could some one please help me out is some other configuration is there.

Sorry forgot to add I need this for Multi Resource Planning so that I can use it in splits of the assignments.

Your valuable inputs are welcome.

Viewing all 5426 articles
Browse latest View live


<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>