Quantcast
Channel: SCN : Discussion List - Enterprise Asset Management (SAP EAM)
Viewing all 5426 articles
Browse latest View live

G/L account determination based on material group

$
0
0

Hi All,

 

We would like to default G/L account determination based on material group for non-stock material in PM Orders.

 

Any suggestions as how to determine the same.

 

Thanks in advance


need logic for catalogs

$
0
0

Dear All,

 

We have one requirement  for Report,

 

We have catalogs defined for the WCA Application. We have created one application , in the application we have given the catalogs like (safety and parameters). Once we assign the catalogs for the application , in that we need to write the long text for the codes.

 

So can you help me from which tables can we fetch the long text written in the catalogs for that specific application.

PM as a initial Module

$
0
0

Hello Experts,

 

I know best practice is to implement the PM after implementing other components such as FI/CO,MM where company structure is defined.

My question is what would be issues which may arise if we going to implement the PM as a very first module in a client site?

 

Thanks in Advance

 

Ashok M

Raising a notification from 3rd party software

$
0
0

Hi

 

We have a client looking at raising notifications within the asset management system of SAP via a sql/.net software application. The 3rd party software has a defect register which could be used to open the SAP notification. We would like to populate the fields automatically when the notification is opened.

 

Is there a current feature within SAP to raise single or multiple notifications via a 3rd party application?

 

Cheers

Russell

Enabling safety permits and user status basing on the permits assigned in Eq master

$
0
0

Dear Experts,

 

We are not using WCM.

 

I have by default assigned permits for some equipments, so when ever MO created permits will be fetched automatically in MO.

 

But before the permits are going to release release, I need approval from two more persons (Ex. HOD,E&I).

 

I have create a separate order type (Ex..PMOP- Order with permits) and used user profile to maintain approvals.

 

But, now the requirement is can I achieve this, with out separate Order type(PMOP, which has to maintain user status).  So when user is creating the MO with any order type, and if permits are already assigned to equipments, User status should copy in MO.  Is there any possibility? or is there any alternative process to achieve it.

 

Regards,

Anil.

Dynamic Preventive Maintenance

$
0
0

Hello PM experts,

 

 

Given the same operating conditions, the efficiency of an equipment decreases over time. How can we handle such scenarios with Maintenance Plans.

 

For instance, let us assume that maintenance need to performed on an new equipment after every 3 months (or 100 kms). After 5 years (with the same operating load), the maintenance frequency will have to be increased to compensate for the decreased efficiency? So, instead of performing maintenance for every 3 months, we may need to do it for every 2 months (or 75 kms).

 

I understand that we can create a new plan with a modified cycle length for this. But can we dynamically handle the maintenance of an equipment over its lifetime with one Maintenance Plan alone?

Querry related to settlement rule

$
0
0

Hi,

      I have given default receiver as CTR and given cost center in IE02 / Now when creating Order, i am able to get default settlement rule .. but i am getting 02 line items in settlement rule both with same settlement category as CTR and same cost center ,settlement percentage is also 100% ..the difference is first line item has FUL and second line item has PER as settlement type .. I would like to know where do we control to always get 02 distribution lines in default settlement rule ..

 

Hope i am clear

 

regards

giri

Schedule/actual start and end date should be editable(should not be greyed out)

$
0
0

Dear Experts,

 

 

I want to fill date in Schedule start and end date field but it's greyed out as per the screenshot.

 

Schedule start & end dates.JPG

How I can enable this field??


Budget Control

$
0
0

Dear Experts

 

My client requirement is as below

 

There are 3 types of budget for maintenance. normal, major and capex. We are using wbs element for Capex and Major maintenance. But for normal maintenance they are having annual budget department wise. while creating maintenance order they want to know how much budget is left in their account. How should we map this in sap.

 

Regards

 

Ramesh

Impact on Changing the Factory calender in Work Center?

$
0
0

Dear Team,

 

My client is facing one issue with the factory calender. We have assigned the factory calender which is having holidays on Saturday and Sunday. Now for PM module they need 24*7 issuing of orders and permit.

 

I saw some posts and configured new calender without holidays and assigned the same to Work Center. Is this is the only way to achieve or else any other work around for this?

 

And if we make the changes in the work center will it effect on previous orders and history in Production server. In my investigation i found no issues does any body faces the issue.

 

Regards,

Bhanu.

pass on Guarantee Start Date from manufacturer to repairer

$
0
0

Dear Sap Gurs,

 

My Client has requirement that after expiration of manufacturer's guarantee, the repairer guarantee start and end dates should be updated in equipment master data.

 

In this case how to track both manufacturer's guarantee and repairer's guarantee .

 

Please suggest solution to map this process.

 

Regards

Kiran Ambi

Takeover/Handover-PM business funcationality process

$
0
0

Hi Guru,

 

Anyone could help me to understand the takeover/handover business function in SAP.

I can see the configuration nodes after activating the business function LOG_EAM_TOHO.

But I am at all not aware to use this fucntionality.

Please guide me the configuration as well execution of the handover/takeover transaction.
I found some documents in SAP help but not that much helpful.

 

Regards,

Baiju

Business Area field to be removed while creating WO from Notification

$
0
0

Dear Experts,

 

While I am creating work order with reference to Notification, system provide pop-up as per below screenshot to copy data from Notification.

 

Business Area.JPG

 

Now I would like to remove field "Business Area" from pop-up.

 

What steps I need to follow to remove this field from config?

 

Thanks in advance.

User Exit : Auto Release Sub orders

$
0
0

Hello Gurus,

 

I want to automatically Release the sub orders when superior order is Release.

 

After I wrote to SCN, I came to know that In Standard, There is no provision to auto release or auto TECO or auto Business completion of Sub Orders based on Superior Order business transaction.


Can some one please correct the exit & condition I selected


On exit IWO10009 when saving the superior order


IF sy-tcode = 'IW32'.

 

SELECT AUFNR

FROM AFKO

WHEREMAUFNR = caufvd_imp-AUFNR

 

release_order = 'X'.

 

ENDIF.

 

If above exit is incorrect,Can I use Exit IWO10002

If above exit is correct,Can I same to auto Business complete the Sub Orders when Superior Order CLSD


Thanks in Advance


Ashok  M

Scheduling of Usage based strategy plan

$
0
0

Hi,

 

Usage based strategy plans are of start in cycle nature.

 

Whats the approach in scheduling the plans initially?

Is it required to schedule it one by one manually or any BDC /Upload program to help in doing that?

 

Regards,

ebin


COMPONENT and equipment scenario

$
0
0

Hi Guru's,

 

 

 

In this scenario I am just talking about I have one COMPONENT and that attached with

All three equipment (this scenario).

 

Now my question is when in equipment number 10020154, we want to reassemble and repair for 4 or 5 days and then in that same equipment add new one component, but

After repair of that component we kept that component in the store and we know this is old one and we new one is assemble.

 

In our case (Since the material removed cannot be used further as it has malfunctioned can be declared as scrap in case of non-repairable condition)

But in our scenario its not here when the case is opposite as I said again use but again use of it that will have costing issue.

 

So Plz tell me how can we go through.z

component.jpg

BR

atul sharma

Effect of Planning Plant in Tasklist

$
0
0

Dear All,

 

I having one query related to Tasklist in PM

There are two Plants X and Y

Earlier tasklist created for Planning plant as X at header level.

Now Planning plant X has been closed , Instead of that need to use Planning plant Y.

There is no issue related to maintenance work cernter and associated Plant.

In my PM order Planning plant only showing at operations level only.

 

At header level planning plant can't be change , Is there any issue if i will use old one planning plant ??

 

Please advise the effect of Planning Plant.

 

Thanks,

Abhishek

 

 


PM: New feilds to be added in IH01 Transaction

$
0
0


Hi Experts,

 

I have a requirement that, Materials Storage Location and Total stock needs to be populated on IH01 transaction.

 

Is there any Enhancement/ BADi for this requirement?

 

Please find the attachment for your better understanding.

 

 

Br,
Sandeep Chebathini

Functionality for Calibration Control and Metrology Control: SAP or non SAP

$
0
0

Hi Experts,

 

 

We need to know if there is a SAP functionality, integrated with SAP by interface or an especialist system, that meets the Metrology Control and Calibration Control for maintenance equipment.
We know of the existence of the order type PM05 that addresses this issue,
but we need a more complete functionality, as below:

 

  • Periodic evaluation of the frequency of calibration based on Schumacher(method for determining the frequency of calibration of measuring
    instruments) or another  similar method.
  • Calculation of uncertainty according to: EA-4/02(STANDARS In NIT-
    DICLA-021) for each specific need.
  • Inclusion of technical information for instruments(technical
    drawings, instruction manual, CAD, etc).
  • Graphics generation for decision making.
  • Alert to send email to administrators, informing system calibrations
    to be perfomed and their due dates.
  • Print a calibration form of each instrument and its calibration
    certificate.

 

thanks,
Gabriel M.

idoc type for IQ01

$
0
0

Hi Guys,

 

Can you please share idoc type for IQ01(Creating Material Serial No + class characteristics). Is it exists?

Viewing all 5426 articles
Browse latest View live


<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>