Need documents on warranty claim process
Hi Gurus , Can any one please help me with Warranty claim documents. Thanks &RegardsKhan
View ArticleNo status object is available for MPL 27128
Hi, Request you to reply on below issue. I am facing the error while trying to change the maintenance plan. Error details: No status object is available for MPL 27128Message no. BS001DiagnosisWhen...
View Articlemeasuring point category or characteristic
Dear all, im not sure, whats better. I have several categories of measuring values, for example machine hours, electricity, water and so on. So now, im not sure, is it better to create several...
View Articlecomponent is under warranty and operations are billable
Hi Friends, We have a requirement in which service order is booked for Planned cost and actual cost for Operations and components, but components are under warranty and it cannot be billed to the...
View ArticleIP30 Exclusion of Inactive or Deleted Plans
When running IP30 I do not see a way to exclude any plans that are inactive or deleted. some will say that they are not included as they do not get scheduled. That is true, however, when running IP30...
View ArticleMandatory fields while doing confirmation in IW42 & IW44
Dear Gurus, Does anyone have idea, how to make Mandatory for these two fields in Transaction Code : IW42 & IW44 for Actual Work (AFRUD-ISMNW_2) & Personnel number (AFRUD-PERNR). I did the...
View Articleerror of picking up different planner groups in report
hello gurus, i do have an issue where i need to get the report including the planner group. i do have two plants with two planner groups say ex :- plant1 :- 6100,6200....
View ArticleHow to acces individual availability capacity of work center
Hi , I know this is derived from Start-Finish = Hrs less Breaks X utilization X number of capcity of work center. However can anyone guide how to get this data through tables as available capacity is...
View Articlein zreport planner group is picking different plant planner group
in zreport planner group is picking different plant planner group of different plant For example The order has 1000 plant planner group p1 When i tried to take a zreport i am getting different plant...
View ArticleLinking Equipment to Characteristics
Hi Everyone - can anybody tell me if it is possible to link an equipment from EQUI or V_EQUI or EQUZ or any other equipment table to AUSP characteristics table so I can pull up the characteristics on a...
View ArticleHow to delete a table in Query transaction SQ01
Hello Gurus, I had created a query with viafkos,jcds & jest but know i want to delete jest when i am trying to delete following error i coming.
View ArticleUnloading Point in PM Work Order's Component Tab
The Unloading point is a required field in the Component Tab for a Material, while creating a Maintenance Order in PM. The Unloading Point is not in SPRO, and nowhere in Material Master. Unloading...
View Articlerevision
Hi all, In order we have a field revision in header data, what is the use of this field. in help its written that time period during which part of machine or machine is shut down for maintenance and...
View ArticleRecording Compliance in SAP PM (Electrical)
Hi Experts, I'm looking for some options for how to record electrical compliance for SAP maintenance order/operations. We have a new regulatory requirement to capture that any electrical equipment is...
View ArticleArchiving Functional Location
Hello Experts, We are facing the issue in archiving the Functional Location. We have created some functional locations, but by mistake the structure indicator is interchanged in between the functional...
View Articlewe got a new roll out project
I want to know from where we have to start the project I am stuck from where to start ? what to collect from end user?
View ArticleNo Purchase Requisition generation for WO with control key PM03
Hello expert, I have a question regarding PR generation from Work Order.There's a requirement for recurrent service, No PR should be generated.Framework Order will be created and Service Entry Sheet...
View ArticleNo status object is available for MPL 27128
Hi, Request you to reply on below issue. I am facing the error while trying to change the maintenance plan. Error details: No status object is available for MPL 27128Message no. BS001DiagnosisWhen...
View ArticleCM34 - Increase the planning period
Hi I am trying to dispatch an operation which has a very long work which obviously cover multiple days. (see the attachment = 201 hrs of work required) I have only 5 hrs of remaining capacity for...
View ArticlePurchase Requisition for diffrent plant.
Hi Expert, I have define diffrent order types to two plant, but PR document type are same for both plant bcoz it assign at maitnt.order category.I want to assign diffrent PR document type to respective...
View Article