Activity types for Specific plants.
Hello All, I want to pull out all the activity types which are using by certain plant, I know activity types are assigned to controlling area, but when I tried with t code KI03,I got huge number of...
View Articlepreventive maintenance vs corrective maintenance?
hican anyone briefly explain with example the difference between preventive maintenance and corrective maintenance. regardssanjay
View ArticlePreventive vs. Corrective Order
Hi all, How can I differentiate a preventive orders vs. a corrective orders in SAP?Is the order type the same for both PM01? or different? thanks,neo
View ArticleHow to restrict user from certain cost element in work order
Hi, Does anyone know how to restrict user from certain cost element in work order? We know we can assign cost element to value category in tcode OIVC, but i wonder how we can restrict user from...
View ArticleRegarding Plan and Tasklist
Hello guys, Is there any t.code so that plan number can be known using tasklist id. thanksSai
View Articlesafety equipments in SAP PM
dear All, Kindly guide me , how I can implement Safety equipment for example Ropes, wires, Jacks in plant by using plant maintenance module . As these equipment are necessary to monitor through SAP...
View ArticleRegarding Start Date,Plan Date & Call Date
Dear SAP Folks, I created a Strategy based maintenance Plan in which the call horizon is 100% and scheduling period is 7 Days.If I enter start of cycle 30.06.2015 and scheduling using IP10 it gives...
View ArticleHow to skip a scheduled PM Order that has been already been created
Hi, A preventive maintenance order was initiated by system on 15-6-2013 based on its reoccurrence time with Frequency 30 Months Now since machine is running smooth therefore we don’t want to carryout...
View ArticleAdding fields to IW49N
Hi all, Is it possible to alter IW49N to add a field as part of the ALV output?The report shows basic start date, order, equipment, etc but I need to see the planned date thanks,neo
View ArticlePM Orders still trying to Settle even after been settled in full
For our Plant maintenance orders, We have hundreds of them that have been settled in full and are TECO status. They're assigned to cost centers, which last month we blocked. Now when we run the...
View ArticleDifference between service order/notification to the maintenace order/notif
Hello friends,please explain the Difference between service order/notification to the maintenace order/notif and also to the Sales order. i have a idea on the above topics. iwnt to have a detailed...
View Articledeferrence between configuration & customization.
Hi All,can any body explain the deferrence between configuration & customization with a suitable example. Regards,Payal
View ArticleRepair Tab missing in Repair Order(VA02)
Dear Gurus, In Repair Order process after notification has been created(repair order also created in Notification simultaneously), in IW52 through document flow entered Repair order(VA02)....
View Articleintegration between value contract &service order
hi experiment , i am read the value contract but i am confused for many point :1-how integrate between the value contract and service order2-whats the scenario can be made3- how to customize the item...
View Articlesettlement error
Hi all,while doing settlement i am getting below error please check the below error and let me know where and how can i change.
View ArticleCosting error in pm order
Hi all,Please check the below error in pm orderMessages were issued when costs were calculated (see log)Message No. CK262 when i check cost overview i am getting above error can any one please let me...
View ArticleRegarding maintenance strategies IP11
Dear SAP Folks I want to create new maintenance strategies with strategy unit Hours in which I want cycle length for 1 Hour ,5 Hour,8 Hour but system gives a message that the cycle length must be a...
View ArticleTwo separate collective PRs for Non-Stock Items and Services in Maintenance...
Hi Experts, My scenario is as follows: I want to create two separate PRs in maintenance order. i.e., One PR for all Non-Stock Components and another PR for Services. If I enable Collective PRs in...
View ArticleIs there any way to change early start date on WO without going into the...
Like I asked is there any way to take multiple work orders that have their early start date with the just start on and give them all another date? I can change almost all I need to in IW38 but haven't...
View ArticleSAP Plant Maintenance Configuration Guide
hi friends, i am working in a construction company and our compnay has implmented SAP ERP ECC 6.0. I am in PM module. I want to learn the configuration part. Please suggest me any gud link(ebook) in...
View Article