Quantcast
Channel: SCN : Discussion List - Enterprise Asset Management (SAP EAM)
Browsing all 5426 articles
Browse latest View live

Measurement point

Dear Gurus,   I have a point of measurement linked to a plan and this is set to be generated when this point ordems achieve certain hours, such operations. A contactor called a compressor hour meter,...

View Article


SAP IN COMPUTER PRIVATE

I WOULD LIKE TO HAVE SAP PM ON MY COMPUTER THAT I MAY TEST SOME THINGS, IF SOMEONE KNOWS HOW TO HAVE AND if I could?

View Article


WCM - Configuration and Steps

Dear All, I have to configure WCM in my company and but i dont have much idea, so please help me in this regards. Required WCM Config and steps how its works. Thanks Sushant

View Article

order conformation-activity type -warning message

dear all, i created one maintenance order with operation details work hrs and duration,but i not mentioned activity type(engineer,labour) and i done confirmation odederat that time i wnat to get a...

View Article

Work Order > PR > PO currency issue

Hello, My client has a scenario whereby they are using the PM02 Control Key to create a PR in a WO and after entering a price the default currency is GBP which I know is being taken from the Company...

View Article


Need to fetch the "Planned dates" of the earliest Maintenance call number...

Dear PM experts, I am creating a custom report for next due date for a maintenance plan number. Next due date refers to the next Planned date which is having the status of "Scheduled  Hold" or I need...

View Article

Image may be NSFW.
Clik here to view.

Skipping Initial Screen at WC Application

Hello Experts, While creating work application from Work Approval, i m getting following screen where i just need to hit enter. Can this step be skipped so that user directly get main screen for WC...

View Article

Image may be NSFW.
Clik here to view.

Schedule Call Plan Date

Hi PM Gurus, I'm hoping someone will know the answer to this question... Why is there a one day deviation between Completed Date and next Plan Date?  As you can see from the screen shot below, some...

View Article


Image may be NSFW.
Clik here to view.

RELR System Status

What will prevent a work order from being automatically released from a maintenance plan?  I have found that if you set the "system condition" to be a required field and not set it in the "Task List:...

View Article


HRMS push button is not active in IR02

Hi Experts,HRMS push button is not active in IR02. We have HR Data in our system, When I check with HR Functional consultant, he said, its an IMG Activity from PM / PP. Please guide me how to see HRMS...

View Article

Planned cost in operation and component

Hi Experts, I am creating order manually in IW31, and for component with item category N I am updating 100 inr as cost. But in cost TAB I can see cost appearing as 200 inr.After analysis I found 100...

View Article

Notification Enhancement

Hi all, I have a requirement for SAP PM notification enhancement.I want to add one more tab to existing Notification type. This new tab should be visible to only  some group of people and for rest it...

View Article

How can we remove PM order from PM notification ?

Hi TeamIs there any way to remove PM order from PM notification ?My client created PM order through PM notification and changed Status of PM order NCMP (do not execute). Now he wanted to created other...

View Article


SAP PM training material

Dear Experts,I am new to SAP PM module and looking for PM training manuals.I already search it but not able to get as per my learning expectation.So that's why I like to request you all to share the...

View Article

POP Up Required for Preventive Maintenance

Hi Guys,I have a requirement where we have monthly cycles for an vehicle lets say 1M ,3 M etc now user wants to have a pop up saying that how many kilometers is entered and how many kilometres left for...

View Article


Image may be NSFW.
Clik here to view.

MCI8 report i want to Drill down by some other field

Hi Guys,I want to add a new Field for my Drill down how can i add it .   How do i do it?i tried googling could not find convincing answers RegardsMZI

View Article

Assigning Technical Objects to a Service Contract Item.

Hi All,  1. Is it possible to assign any number of technical objects (i.e. Equipments & Functional Locations) to a Service Contract item(s). If not, what is the limitation?  2. Is it possible to...

View Article


Fleet management - excluding some vehicles from PAM03 pool

Hi,We are implementing fleet management.. Requirement is as follows. we have around 50 vehicles in our pool which are used for outbound delivery of products. these 50 vehicles will appear in the pool...

View Article

Maint.Order Print Directly without going to spool.

HiWhen i have to take print out maint. orderevery time i have to go to spool and then print therei just want that in iw32or iw3d when i select print it should print automatically. Where to check and do...

View Article

Assigning Technical Objects in a Service Contract

Hi All, 1. Is it possible to assign any number of technical objects (i.e. Equipments & Functional Locations) to a Service Contract item(s). If not, what is the limitation? 2. Is it possible to...

View Article
Browsing all 5426 articles
Browse latest View live


<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>