Assume that in an equipment there are N no of assemblies, they need to carry out different operations on different assemblies.
1. How to map this in a single order.
2. Client requirement is they want the Assembly column to be displayed in the completion confirmation screen (IW42).
For example
Equipment Assembly Operations
1. CNC 1. Assembly 1 1. Cleaning
2. Lubrication
3. Filtration
4. oil level checking
2. Assembly 2 1. Cleaning
2. Lubrication
3. Filtration
4. oil level checking
3. Assembly 3 1. Cleaning
2. Lubrication
3. Filtration
4. oil level checking
Please give me some inputs on this....