User Status control based on user authorisation

Hi Experts,I would like to know the solution for one scenario, asI have below numbered User status 10  CRTD20  ISSUED30  CLOSE40  CNCLand want to control based on authorization, as Person A got...

View Article


PM Order - System Status and User Status Update

PM users in my organization have a requirement to prevent Order Confirmation upon TECO. I created a user status that prevents confirmation. I asked them to choose this user status when they TECO the...

View Article


issue in generation of no. of work approval in wcm

Hi experts, I am facing an issue in wcm. after entering into maintenance order when i click on work approval it creates no. of work approval which should be generated when we set it as prepared. kindly...

View Article

PDF files to study SAP PM

Hello everyone, I am new to SAP PM module and I need materials and e-books to study the module, where can I download the book  'plant maintenance with sap practical guide' by Karl Liebstückel, 3rd...

View Article

Cost center auto populate to pr from pm order

Dear expert,Please suggest method for auto populate costcenter in Pr from pm orders .It is a requirement in my client .At present we are able to get only order no .With regardsAnand

View Article


Blocking Specific Material Type in Work Order

Dear Gurus,  Is there any way to block specific material type in work order. Could not find any suitable link in SPRO.  Advance thanks for the update / response. Sahu.

View Article

How to map Resource related billing through sap pm

Hi all,  I have a new requirement from one of my client.one plant(says A) provides the maintenance workers to other plant(Says B). Plant A charge on hourly basis to plant B. Workers fill time sheet...

View Article

Image may be NSFW.
Clik here to view.

List operation PM Order - (field UVORN)

Hi, Does Itset the fieldUVORN (table AFVGD-UVORN)for specifictypes of PM Order? I dont have in transaction OIOPL field UVORN. Thank you Martin 

View Article


PRT Reservation in Maintenance Order

HI Experts 1) If It is possible to consume/reserve PRT in maintenance order. If yes, then how plz suggest. 2)There is a X No. of PRT available in Plant that are being used during maintenance activity....

View Article


IW42 Confirmation Screen Default Values for Goods Movements

We are using IW42 to enter time confirmation and also issue material to a PM Order. On the material issue screen once a material is entered with quantity SAP does not automatically determine plant and...

View Article

Message no. I0206

Dear Expert, When I'm creating a new functional location or only editing/viewing an existing one and I'll shift from tab general to location I'm facing with message below: Planning plant XXXX is...

View Article

Restrict time confirmation entries

We have a requirement to restrict the number of hours entered into any time confirmation screen.  For example, if a tech forgets to enter their time they will enter multiple days worth and/or they...

View Article

Image may be NSFW.
Clik here to view.

PM Activity duration decimal places for task lists and maintenance order...

Hi All, I am having a problem when i enter figures in the activity duration field, it's only accepting 1 decimal place. What should i do so that the system accepts up to 3 decimal places?  Regards,...

View Article


ABAP dump for IH01

Hi Friends, I have been facing one critical issue that,for one particular user Id system is getting ABAP dump for IH01 T.code ,that to if i select tick mark in "Equipment installed field" inExplosion...

View Article

Time in Maintenance Order

Hi expert  May you give me information , how can active the field Basic start time and Finish time in the maintenance order? Now this two field aren't visible on the Maintenace order header. Please let...

View Article


Preventive order before 160 days(160*24 hr) for counter based Plan

Hi Expert,                As per business requirement, Preventive maintenance order should be generating before 160 days (160*24 HR) for counter based maintenance plan. Actually this is very highly...

View Article

Hide selection screen fields of iw28 and iw38.

Hi experts, How to hide selection screen fields of iw28 and iw38. We have tried with transaction variants and copying the standard program to a Zprogram.Both of them are not working. If someone can...

View Article


scheduling of maintenance plan

I all, What is the best way to schedule 1000 maintenance plan ,if I want to schedule 1st time in system. IP10 is each plan based, it will take a lot of time.

View Article

ABAP Dump

Hi All,For one user once selected  Equipment installed in t-code IH01 , ABAP dump as attached is coming whilefor another user with same input parameters values data is populating . Both user id has...

View Article

Counter Based Plans still triggering PM Order

I am having the same issued as defined in this older thread that was never answered.  I have a meter that has not been running and we are receiving same run hours nightly which logs no additional run...

View Article