Using classes in functional location object
Hi, I am looking at using classification system to control linking a functional location to a characteristics value which would refer to another functional location. Is it possible to accomplish this...
View ArticleUnit missing in check table for UOM for time
Hi gurus,I am facing below issue. Please check the below screen shots. When I am creating the notification through IW21 for Breakdown dur. UOM H coming as default but for Repair dur it is not coming....
View ArticlePreventive maintenance
Hello Experts, My client requirement is one of critical equipment needs preventive maintenance schedule dates like 01/05/2014,15/08/2014, and 10/12/2014. (Equipment schedules not particular time...
View ArticleDoes EAM/ PM has a Framework ?
Hello EAM/PM experts,I would like to know if there is a framework for SAP PM/ EAM.If yes, can you please explain the same ?Best Regards,Rekha
View Articlecreate AuC settlement rule and settle to assets
Hi Experts, we have a requirement to automate the creation of AuC settlement rule and distribute it to asset using distribution rule. We failed using BDC for AIAB transaction as BDC does not work for...
View ArticleWork order component screen
Hello, I have a requirement to add the component description field to the "Component Detail Purchasing Data" screen in the work order. Please see screenshot. I went to SPRO PlantMaintenance and...
View ArticleSystem condition on operation level - block capacity in CM21
Dear Gurus, We want to use system condition on Operation level in Maintenance Orders, to see capacity blocked in CM21 only for time from some (not all) Operations. 1. We have assigned PP Workcenter to...
View ArticleEquipment classification.
Dear All, I want to do equipment classification in large amount.i had created LSMW for tcode CL24N its working but in that i cant used,not more than 10 characteristics but i need more than 10.how can...
View ArticleTable to find Asset - Equipment Assignment start and End dates
Hi All, I would like to know SAP Table where I could find Asset - Equipment Assignment start and End dates.I could see the equipment is linked to asset in AS03 - Allocations tab Thanks ,Krishna
View ArticleEquipment/asset number range and Maintenance budget
Dear Expert, 1 - In my 1st scenario,all equipments are created as a asset from FI. When the asset is created with number range e.g A0001 then my equipment should also get created with the same...
View ArticlePerformance Determination by Measuring point
Hi All, My Business require to send Activity Report notifications (M3) to respective Users about non performing DG Set located in all Maintenance plants.And their is a measuring parameters if Power...
View ArticleMass Change user status - Operations
Hi, Can I Change mass user status - operations? (Transaction?) Thank you Martin
View ArticleOrder operations time consumption report
Hi Experts, I am looking forward to meet a business requirement to present where I can see how much time (Hrs) has been consumed in maintenance operations like in breakdown order (PM02) or in...
View ArticleCan we Download P&ID Metadata stored in SAP System
Hello, I'd like to know that is it possible to download Piping & Instrumentation Drawings Meta-data from SAP PM Module to any file format e.g. Excel, XML, etc. Kindly enlighten me about this...
View ArticleSchedule Call Plan Date
Hi PM Gurus, I'm hoping someone will know the answer to this question... Why is there a one day deviation between Completed Date and next Plan Date? As you can see from the screen shot below, some...
View ArticleMRS Slot Based assignment among capacities
Hi Mithun/allI'm desperate for help where I need to do automatic scheduling for slot based automatic assignmentsExplanationIf I have 8 Hrs assignment & I have 4 resources in the work center we need...
View ArticleMultiple Responsible Persons Entry for An Operation within a PM Work Order
Hello PM Gurus! Within a plant maintenance work order, there is supposed to be a capability where one can assign multiple persons responsible (partner type VW) to an operation along with the ability to...
View ArticlePM mantenance plan deadline monitoring IP30
Dear friends,We are runing ECC 6.00 since 2007 and we had created back ground job for the transaction IP30In this transaction, selection of Maint Plan kept " BLANK "This back ground job was runing...
View ArticleSettlement of Suborders
I know it is standard to settle suborder costs back to the superior order, but we need the cost center department split on each suborder since each suborder will be performed by a different department...
View ArticleEquipment: change cost center assignment with a "valid from" date in future?
Dear colleagues, we have the requirement to change the cost center assignment of some equipments by 01.01.2015.As on this date no one is in office, I'm curious if there is a functionality which allows...
View Article