Hi Experts,
While creating PM order through IW31 when we are going to select material in component tab and while cost determination the following error comes.
Messages were issued when costs were calculated (see log)
Message no. CK262
We are creating Material with following steps with LSMW.
1) First we are creating material through MM01 with Price determination=3 (Single/Multilevel) and with price contol indicator V (Moving average price)
2) In second step we are changing Price determination 3 to 2 (transcation based) through t code CKMM.
But when we are creating material manually with Price determination 2 and Price control indicator V then we are not getting any message.
Thanks and Regards
Vishu