Hi everybody.
I'm having an issue in some Assets:
The Asset is shutdown from 01.03.2013.
In planned posted appears +/-0.01 in every month.
In March, April. May this +/-0.01 has been posted.
For next months the planned posted appears with +/-0.01.
How can I stop that planned posted when the asset is shutdown?
Thanks in advance.
José Luz Medina.