Hi friends ,
I ahve created a single cycle counter based maintenance plan .In the Plan itself , i have mentioned start of counter with other required scheduling fields like Scheduling period , Call horizon = 100% ,cycle frequency = 20 hrs
Now , my problem is that even on posting the measurement document with reading greater than 20 , order is not geting generating . It is getting generated only when I run IP10/IP30 .
Probelm 1 : But the problem is that I want order to get generated immediately as soon as the reading in measurement documents matched frequency of plan . What can be done to achieve this .
Now if I schedule IP30 in background then order will get generated only after the execution of IP30 in background . Should I schedule IP30 at interval of very short time say each 30 minutes ?
Problem 2) :Also , we have other single cycle time based plans . For that we want order to get generated 10 days earlier before actual maintenance date . For that I need to schedule IP30 with 10 days . I think I need to create maintenance plan sort field to schedule time based and counter based plan seperately with IP30.
Is there any aother work around ?