When i save maintenance order, Work and Number column in operation tab defaulted with values as 2 & 1. Due to this duration is 2HR.
Calculation key is set as Calculate Duration in configuration.
Any Idea how Work and Number column in operation tab defaulted with values as 2 & 1 ??