Hi,
We are using the functionality calibration process. So when the calibration order is created inspection lot is created. Problem is PM people confirming the PM Order but not doing RR and UD for the corresponding inspection lot. due to this lot of open inspection lots in the system.
what user exit can be used to prevent this means.... when the user confirm the Calibration order if the corresponding inspection lot's RR and UD is not done then system should not allow confirmation of the calibration order.
Thanks
Kumar