Dear All,
http://www.sapfans.com/forums/viewtopic.php?f=7&t=316460
my question is describes in above link, requirement is same with above link.
below is the copied contents from above link.
In the standard system, the call horizon % is based on the smallest package used in the maintenance plan..
We have a typical scenario where we want the call date to be 6 months earlier than the 3Y or 5Y inspection.
Has anyone managed to manipulate the call dates (not plan dates) in a maintenance plan via user-exit/BADI?
please help me is there any enhancement point?
Best Regards,