Hi all,
I'm looking at the capacity load for a work center in CM01 and it seems like it is calculating the load from the "standard available capacity" settings.
5 days x 24 hrs x 1 worker = 120 hrs a week
However I want the capacity to be calculated from the shifts that I have created in the "Interval and shifts" settings. The work center has 3 shifts Monday through Wednesday and only 1 shift Thursday and Friday
(3 days x 3 shifts x 8hrs x 1 worker) + (2 days x 1 shift x 8 hrs x 1 worker) = 72 + 16 = 88 hrs
The capacity of the work center is always 120 hrs no matter what changes occur in the shifts.
Thanks in advance
Michalis