Hi Experts,
Please clarify me whether issue I am facing is standard SAP behaviour or I am missing some steps in configuration .
of p
I want three type permits (L1,L2 and L3) according to my planned cost in maintenance order e.g.
if planned cost is =<100000 than permit L1 should assigned in auto.
If planned cost is between 100000 to 200000 than permit L2 should be assigned.
and if planned cost is >=200000 than permit L3 should be assigned.
I have done all settings and everything is working fine.
I have assigned all characteristics to all permits with desired interval or values.
I have set order release and order completion = "2" .
that's I don't want to get order released or completed without issuing desired permits.
If I am trying get permits without releasing the order than it is working fine and are permits are getting assigning accordingly.
Suppose if first time I am reserving materials up to a planned cost <100000 than permit L1 is getting assigned .
If I am releasing maintenance order after issuing the L1 permit (I am saving the order) and again reserving more materials to the same order which results the new planned cost >100000 or 200000 than there is no further auto permits assignment.
It allows people to play a trick and initially they are assigning less quantity (<100000) and after once order got released they are adding more quantity to the same order.
* I know that by using Exit I can restrict the persons from adding more components once it got released.
But it will solve my purpose because I don't want to put such kind of restriction.
So please let me know the solution for the same or make me correct if I am missing some settings.
or let me know if it is because of the setting which I have highlighted with red colour on above.
With regards,
Raj