Hi All,
I have a requirement to link notification to three follow on actions namely:
1. Work order creation (IW31?)
2. PPM to create project
3. Change request to review document (CC31?)
These activities are actions required from Root Cause Analysis. RCA is being done by an external system. An interface is to be used to create a notification in SAP PM. The notification is to be configured with an Action Box containing these three activities as follow on actions.
Is this possible to achieve? And if so, what FM can be used for each of the three SAP Objects?
Will there be a link between the three created objects and the Notification?
Will it be possible to update the Notification with the statuses of any one of these three objects automatically?
Your response would be very much appreciated.
Kash