Hi all
Suppose a piece of equipment is used between a number of work centres.
A maintenance plan is created to carry out inspection/repairs at set intervals.
Is it possible to have the Maintenance Plan/Task List Work Centre to change as the equipment changes work centres?
E.g.
Equipment installed in FL 1, WC 1. Plan is created with WC 1.
If equipment is now moved to FL 2, WC 2 i would like the planned order to be released in WC2, not WC1.
I hope my question is clear!
Thanks for your help.
Dominick